specification section 16010

HWYsF~-*e{+*f4yHtOMR[.Sdh0~qzu8Udil;GiY"%g9'qn+6}Wj}=njO7lgcE}1- V. L1)Tj4d v"1s%H"r$-j` ,}# NECA (National Electrical Contractors Association). Coordination Drawings: In addition to the requirements of the Specification Division 01 prepare the plumbing part for the coordination drawing effort. 3 electrical and mechanical specifications, specifications for electrical unit substation . ?\ 2j0D,xl>Kc2)b01UBu0% ## d X%XIL 5. 16 ELECTRICAL SPECIFICATION INDEX Section 16000 Bid Opportunity No. . Unless otherwise indicated the coordination drawings, including plans, sections, and elevations shall be prepared at a scale of not less than 1/4 inch = 1 foot- 0 inches. Arrange for each installer of equipment that requires regular maintenance to meet with the Owner's personnel to provide instruction in proper operation and maintenance. Samples shall indicate applicable specification section number and item numbers within that section. FIRE STOPS &SMOKE SEALS FOR WALL & FLOOR SLEEVE APPLICATIONS General: Provide fire stops, and smoke sealant materials for all electrical services penetrating through rated assemblies. Obtain all necessary permits from endstream endobj startxref Cut such items flush with masonry surfaces. Permit must be approved by UMB Department of Operations and Maintenance prior to performing energized work. 16010. Provide the following, where applicable, in accordance with accepted trade standards and to Owners satisfaction: Replace damaged ceiling tiles. specifications electrical metallic tubing (emt) t&b detailed specifications for electrical items technical specifications for electrical work, electrical specifications - mouser electronics, electrical specifications & selection guide - delco remy, 2006 introduction to electrical construction specifications, standard in progress edition electrical specifications , electrical specifications manual override, electrical specifications & selection guide, electrical accessories and specifications, specifications for electrical installations, master specifications division 26 - electrical, general specifications for electrical installations, general specifications for electrical works, installation, specifications, service, electrical diagrams. are not concealed by new work. PART 3 EXECUTION ROUGHIN Verify final locations for rough-ins with field measurements and with the requirements of the actual equipment to be connected. Arrange for chases, slots, and openings in building structure during progress of construction to allow for electrical installations. 904 0 obj <>stream #Zkh f9\!A>V=#JM;:Dw. The work plan must include procedures to be used on and near the live electrical equipment, barriers to be installed, and safety equipment to be used and exit pathways. Notify UMB in advance of scheduled inspections. All submitted materials and equipment are subject to approval by the A/E and UMB. The layered electronic files shall allow building elements, building systems and sub systems to be viewed in isolation or in combinations that are user selectable when the drawing files are being displayed. Cleaning: Employ experienced workers or professional cleaners for final cleaning. For equipment requiring seasonal operation, perform instructions for other seasons at the same time. CUTTING, WELDING, BURNING Before the contractor and/or any sub-contractor commences any cutting, welding, burning or other type of hot work at UMB, the contractor shall contact the UMB Fire Marshals Office located @ 620 W. Lexington Street, 6th Floor, Room 6113 or by phone @ 1-410-706-3494 to obtain a hot work permit. }T+A&p~lA&K9V=Zp-8ysG.n{@K?zpW\{\ZZgZU%]M:z ^HsRoiSD-G[ 5#)\EENX6 0000003331 00000 n mHs00\%Q` (Engineer shall edit specifications and blue text in header to meet project requirements. The operation of electrical equipment; required to achieve an outage must be accomplished by University personnel only. 0000001264 00000 n 584 0 obj <>/Filter/FlateDecode/ID[<68D0A66D69CDF1FFF7626FF3652144DE><5293A0C1E7B0C14DBF1945BCD9C7F14E>]/Index[571 20]/Info 570 0 R/Length 71/Prev 500049/Root 572 0 R/Size 591/Type/XRef/W[1 2 1]>>stream ph p he h;F B* %%EOF Hazards. xYsHwy+1pUd}{"!Z@{@\RQ_nM*]/UU-d&|d./lQy6y*)~]#gk6_q_T,@0RldC\EOgO+_nK|at{8u~6}QZ"%USXR_l?v0dHy $6 :r`qoL'mVXlBy~xn{tYi|"ey_jtANNkIA>e{B#(Op N7@{z#/\1a}a\'dD,B:=wT:8BT)v$8 !%KjK\=LOe:. endstream endobj 575 0 obj <>stream endstream endobj startxref left on top of ceilings and ceiling tiles. . Diagrams shall indicate cable on raceway between points. BICSI and NICET certification, where required by these specifications. endobj ELECTRICAL. l2f71S-K#C@EM{Wtq The Architect/ Engineer will not perform any punch list verification until all items have been completed, initialed, dated and the list returned to the Architect/Engineer. 2013 0 obj <>/Filter/FlateDecode/ID[<7A92318D9A66904D9BE2AA2059D48142><9E5BD34DD47A4B4CACDF0D2F3CF07D4E>]/Index[2006 15]/Info 2005 0 R/Length 55/Prev 136060/Root 2007 0 R/Size 2021/Type/XRef/W[1 2 1]>>stream Where pipe sleeves are installed in non-rated CMU walls fire rated sealant materials are not required. All existing unsealed penetrations for services passing through existing rated assemblies within the project area shall be provided with sealant materials. 1.1 GENERAL. For equipment rough-in requirements see specifications for electrical equipment. VARIANCES Where variances occur between the drawings and specifications or within either document itself, the item or arrangement of better quality, greater quantity or higher cost shall be included in the contract price. 0000000596 00000 n SECTON 16010 - GENERAL PROVISIONS 16010 - General Provisions.doc PART 1 GENERAL 1.01 Work Included .1 Provide all labour, materials, equipment, services and supervision required to provide a complete electrical system as listed herein and shown on the drawings. o Remove all electrical clippings, wiring, nuts, bolts, etc. stream endstream endobj 4189 0 obj <. Avoid air entrapment when placing grout. Listing and Labeling Agency Qualifications: A Nationally Recognized Testing Laboratory (NRTL) as defined in OSHA Regulation 1910.7. hbbd``b` $Z ~BARD0 !LAF10t' Cleaning. Any work covered prior to any inspection in a manner which, in the inspector's opinion, precludes a complete inspection shall be uncovered at the installers cost. 16 ELECTRICAL GENERAL REQUIREMENTS Section 16010 0000005420 00000 n SECTION 16012 -- SUBMITTALS CONTRACTOR'S CERTIFICATION: Each submittal shall contain a certification stating that the . All electrical outages which will interfere with the normal use of the building in any manner shall be done at such times as shall be mutually agreed upon by the contractor and the Office of Facilities Management. Emergency operations. 11261 0 obj <> endobj hb```f``2c`a``cc@ >+PRQ0yXgZ-*``z=;K7<72a`19 7h9EmGn6]lyjz\t^io K7] 7x9L+N$ ?ylU#^yr08-;dg{w.\6%n#{6k5SnLl2sP$k$GI,2L Product data as specified in the electrical specifications unless otherwise noted: Warranties and maintenance instructions shall be included in the O & M Manual only. Motor manufacturer, motor type or model . Trouble shooting. 1820 0 obj <> endobj Conform to arrangements indicated by the Contract Documents, recognizing that portions of the Work are shown only in diagrammatic form. Copy of Maryland Master Electrician's License. [r'9}I!tn>oW KYa jRta4UIY3z$[gR%?F5r.jPSbei})lVZHk'vMTEJ|Agdd*z. Provide acoustical caulking to seal the annular spaces between the sleeve and the bare pipe or pipe insulation on each end with one half (1/2) inch caulking all around the annular space. The following list shall be used as a guide only: Equipment such as transformers, generators, etc. Cure placed grout according to manufacturer's printed instructions. 0000001525 00000 n [l*/ XB^c*x=.l0 r Maximum length: (six 6) feet, except where fished. hb```x ,M[Vcv/?LyS:wIf{[zX#F2\3vdzDlLt0t0 h )@" 110wc {_1``Y P ph p haP haU B*ph haP h8 B*ph haP haP B*ph h B*ph h"p B*ph h& B*ph hlg B*ph h+V B*ph h"S{ ho h"S{ h9}- h{\V h8 h[P h8 h9}- h8 h#y h"S{ h#y / j hb```b``va`2~12 3+P!tw0dgCDu/8d.bdhp!M\FuN(#]y.cC756plr3':,u B\ endobj PROVISIONS FOR ACCESS Furnish and install adequate access to all electrical components. ph p hf h8 >*B* This instruction period shall consist of not less than five (5) eight (8) hour days. Cover temporary openings for electrical equipment to prevent the entrance of water, dirt, debris, and other foreign matter. In addition to the requirements specified in Division 1, the following requirements apply: Protection of Installed Work: During cutting and patching operations, protect adjacent installations. Samples shall include physical examples of materials; in complete units for visual inspection. HSMo@Wq~HU8 jPYqz0NAjFgvlwv=~|vjj*5MY}n`yQ?aLu:#heF{L[}:n! /C\_7sHsuHp$c1X?So0u*dMLeqi81cx,B2@(@>Nde7a-KZi:%A o#=drlbI6. PART 2 PRODUCTS LISTED MANUFACTURERS: Listed Manufacturers: The listed manufacturers indicated in Part 2 of each specification section as the basis of design represents the minimum level of quality for materials and equipment that is acceptable to UMB. Engage the services of the Structural or General Contractor, and pay for them, to provide the concrete housekeeping pads. provided by the general contractor and/or his subcontractors shall be guaranteed and warranted to be free from defects in workmanship and materials for a period of two (2) years after date of certificate of completion and acceptance of work by UMB. endstream endobj 2010 0 obj <>stream If any items have been initialed as being completed by the Contractor and the Architect/Engineer determines that the work is not complete, the Architect/Engineer shall be reimbursed by the Contractor at his regular hourly rate for any and all items requiring revisiting of the site by the Architect/Engineer. unless otherwise noted. Installers' qualifications refer to the materials and methods required for the surface and building components being patched. 0 The Terms Listed and Labeled: As defined in the National Electrical Code, Article 100. DEMONSTRATION AND INSTRUCTIONS Demonstrate operation and maintenance of equipment and systems to Owners personnel a minimum two (2) weeks prior to date of final inspection. Coordination Effort: This coordination effort shall include detailing major elements, components, and systems of electrical equipment and materials in relationship with other systems, installations, and building components. SITE VISIT Prior to preparing the bid, the electrical subcontractor shall visit the site and become familiar with all existing conditions. See Specification Division 01 for general requirements. All adjustments and modifications shall be provided by the bidder and appropriate subcontractors at no additional cost to the project. 264 0 obj <> endobj hbbd``b`q @`W@qD%XAWH12N@ M 1.08 TESTING A. Supplementary Conditions and Division-1 Specification Sections, apply to this Section. All communication shall be through this person. Omission of words or phrases such as "the Contractor shall", "as shown on See Architectural Specification Division 07, Section Penetration Firestopping for sealant material requirements. ph p h8 B* Variable frequency drives. The drawings and specifications shall be followed in layout of work. In general, work includes, but is not limited to, the following: Unless otherwise specified, outages of any services required for the performance of this contract and affecting areas other than the immediate work area shall be scheduled at least ten days (10) days in advance with the Office of Facilities Management. while working on energized systems in accordance with NFPA 70E. {s@_yj1' 3{J1tB;=6bcC. English Deutsch Franais Espaol Portugus Italiano Romn Nederlands Latina Dansk Svenska Norsk Magyar Bahasa Indonesia Trke Suomi Latvian Lithuanian esk . All submitted materials and equipment are subject to approval by the A/E and UMB. Sequence, coordinate, and integrate installations of mechanical materials and equipment for efficient flow of the Work. Where access is by means of lift out ceiling tiles or panels mark access each panel using small color coded or numbered tabs. hb```b````a``eg@ ~f(0wPN A8.I.qk``Fx6I 8&Zdl6xHc`p(N:cy$f430o"NNN_r u2Mrf\[7Hcr Tools. 611.0 Acceptance Test 612.0 %PDF-1.5 % .2 This shall generally include work in the following areas: 0000000016 00000 n 2006 0 obj <> endobj Wall Pipe Sleeve Applications: Pipe sleeves shall be required for all new conduit penetrations through rated wall assemblies and non-rated CMU walls. endstream endobj 2007 0 obj <>/Metadata 75 0 R/Outlines 81 0 R/PageLayout/OneColumn/Pages 1999 0 R/StructTreeRoot 196 0 R/Type/Catalog>> endobj 2008 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 2009 0 obj <>stream <>/ExtGState<>/ProcSet[/PDF/Text/ImageB/ImageC/ImageI] >>/MediaBox[ 0 0 595.44 841.68] /Contents 4 0 R/Group<>/Tabs/S/StructParents 0>> Floor Pipe Sleeves Applications: Pipe sleeves are required for all new conduit risers passing through floor slabs. Sizes and location of required concrete pads and bases. 0000002433 00000 n You also have the option to opt-out of these cookies. Each section of raceway must contain an equipment grounding wire bonded at each end and sized as required. PROJECT PUNCH OUT Architect/Engineer will perform punch out reviews and will provide the Contractor with a list of punch list items to be completed before contract close out.

Are Stella Maeve And Benjamin Wadsworth Still Together, Articles S

mitchell community college spring 2022 classes
Prev Wild Question Marks and devious semikoli

specification section 16010

You can enable/disable right clicking from Theme Options and customize this message too.